Where the line sits
Structural work is where the permit starts
The line is crossed when the work touches the structure of the roof. Replacing decking or rafters, changing the pitch, adding a dormer, or cutting a new opening for a skylight all change the structure, and those jobs need a permit. The same goes for a new build, where the roof is part of the permitted construction from the start.
Deck replacement is the case that catches most homeowners by surprise. A reroof starts as a straight swap, the crew tears off the old shingles, and finds soft, rotted boards below. Swapping a few boards is part of the job, but replacing wide areas of decking turns the work structural, and that is when a permit comes into play. A good roofer flags this before the tear-off, so the permit question is settled while the roof is still whole, through roof replacement in Louisville.
Who pulls the permit
Where a permit applies, the roofer pulls it and is named on it. The contractor has to hold a current Louisville license and be named on the application. A roofer who asks the homeowner to pull the permit is a warning sign, since the person named on the permit carries the responsibility for the work.